2. Operational Procedures:
- Proper Setup:
- Position the pump on a stable and level surface.
- Minimize suction lift by placing the pump as close to the water source as possible.
- Use appropriate suction hoses and strainers to prevent debris from entering the pump.
- Safe Operation:
- Ensure all personnel are trained in the safe operation of the pump.
- Maintain awareness of surrounding hazards, such as uneven terrain or traffic.
- Monitor pump performance and make adjustments as needed.
- Drafting Operations:
- Practice drafting from various water sources, such as ponds, streams, and portable tanks.
- Understand the principles of drafting and how to overcome challenges, such as low water levels or air leaks.
- Hose Management:
- Use appropriate hose layouts to minimize friction loss.
- Ensure hoses are properly connected and secured.
- Practice various hose deployment techniques.